GET YOUR BEARINGS
Plan your next Groundwork Simulator session
Our independent guide explores how each core system in Groundwork Simulator interacts, offering observations that help you refine your mining workflow. By comparing the physics of excavation, the logistics of transport, and the coordination needed in co‑op, you can develop a smoother, more efficient operation without relying on undocumented shortcuts.
01 / THE GUIDE
Compare Bucket Angles
Try digging the same hill with shallow versus steep bucket angles. Note how hydraulic resistance changes and how the resulting pile shape affects later routes.
- Observe how the bucket slows on denser material before committing to a lift.
- Experiment with different angles to find the most efficient cut on a given slope.
02 / THE GUIDE
Test Water Placement
Set up two wash plants: one with hoses routed directly from the pump, another with a longer, indirect path. Observe any differences in flow consistency during heavy processing.
- Drill and test in several spots as you explore the land to find gold-rich ground.
- Balance the amount of material you haul with the capacity of your sluice boxes to avoid bottlenecks.

03 / THE GUIDE
Co‑op Role Swaps
Switch roles with your partner—let the driver become the transporter and vice versa. Record how communication needs shift and which tasks feel smoother in each configuration.
- Communicate your intended routes before moving heavy loads to avoid terrain mishaps.
- Assign one player to monitor water supply while the other focuses on excavation for smoother workflow.
04 / THE GUIDE
Terrain Preparation Before Transport
Before moving a trailer, clear a small strip of ground and compare traction versus moving over untouched mud. This highlights the impact of ground preparation on heavy loads.
- Lay hoses along the shortest path to keep your water routing simple as the site grows.
- Keep pumps on stable ground to maintain consistent flow during heavy operations.
05 / THE GUIDE
Gold Recovery Efficiency
Process equal amounts of excavated material through both a single sluice box and a dual‑box setup. Compare the amount of concentrate each yields to gauge processing efficiency.
- Plan a clear, level path before attempting to unload equipment on a new site.
- Use smaller routes to test traction before moving a fully loaded trailer.




